Connecting to a sewer

bywave打不开-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

bywave打不开-outline

bywave打不开-outline

旋风加速器官网,旋风加速器打不开,旋风加速器打不开了,旋风加速器vps  狗急加速器官网下载安装,狗急加速官网正版,旋风加速app官网入口,狗急加速器怎么下载  烧饼哥加速器永久免费加速,烧饼哥加速器跑路了,烧饼哥加速器vps,烧饼哥加速器vn  ytb加速器最新版,ytb加速器安卓下载,ytb加速器pc版下载,ytb加速器vpm  gkd加速器官网,gkd加速器ios下载,gkd加速器电脑版下载,gkd加速器2024  节点加速器下载地址,节点加速器安卓下载,节点加速器vqn,节点加速器vps